Greenhouse Office Spaces, Jordon Station, ON

When a large greenhouse operation needed offices for supervisors and shipping/receiving installed in the warehouse, NRB provided single- and two-storey panelized solutions to allow them to maximize work area but minimize the footprint.

Project Size
240 sq ft (1 storey
672 sq ft (2 storey)
Timeline
8 weeks
Building Type
In-Plant Office
Location
Jordon Station, ON

A large greenhouse operation required office spaces within their plant for shipping and receiving and for supervisors to oversee day to day operations.

At a Glance

  • Built using non-combustible NCP-1000 steel
  • Single storey office has one door on each end to allow easy access. Fixed and sliding windows are strategically placed to have a good view of the facility.
  • Single storey office was installed directly on the existing concrete floor and has fully-insulated walls and roof/ceiling assemblies.
  • Two storey office contains full length windows on the front wall of both levels to allow a full view of the warehouse. Sliding windows on the lower level allow warehouse personnel to converse and pass paperwork.
  • Two storey office has one steel stair assembly with handrail and a landing to access the second floor

Start planning your project

When you’re ready to start, we’re ready to take you through our responsive planning and design process. Get in touch today and we’ll create a plan that meets your goals for quality, design, affordability and time to market.

Search