A steel fabrication company was consolidating two plants into one. As a result, additional office space was required for the engineering and production staff.
Upper level of the structure is connected to existing second floor offices through a new opening in the facility’s concrete block wall, allowing for easy access between new and existing offices.
Lower level contains a single open office area for production supervisors.
Four private offices for the engineering department are on second floor, along with a corridor and two-piece washroom.
Upper floor is 19’ x 52’; lower floor is 19’ x 24’.